Concrete work is not governed by a sales stage. It is governed by a calendar and the weather. A pour day is a truck appointment that cannot move once the mix leaves the plant, the days after it are a cure window nobody may load, an inspector arrives on a day somebody else chose, and rain or a freeze warning pushes all of it. Pour puts one row per job across three weeks of days: a solid black block on the pour day, a gray band after it that lightens one step per cure day, a diamond on every inspection checkpoint, and a hatched band over the days a weather hold covers.
A twenty one day ruler grouped into its three weeks, with today marked. Each job draws its pour day as a solid ink block, its recorded cure days as a gray band that lightens toward the end of the window, its inspection checkpoints as diamonds, and each weather hold as a hatched band with its reason printed beside it.
Selecting a row opens its sheet beside the board: the job record with job type, address, crew, cubic yards, mix and whether forms are recorded as set, the pour plan with the planned and actual pour dates and the derived cure complete date, then the inspection records and the weather hold records with their day counts.
Every job grouped by its native pipeline stage, with the job type, address label, crew label, cubic yards reference, mix label, recorded pour date, recorded cure days and recorded contract reference. The stage select beside each row is the keyboard and assistive equivalent of moving the card in your CRM.
Every recorded checkpoint across the loaded jobs as one table, pending rows first and then by recorded date, with the job, the label, the date, the result and the inspector label. A pending row whose recorded date has already passed is marked with the word Overdue. Archived rows are shown and marked as counting toward nothing.
Every recorded weather hold with the ones covering the selected date first and marked active, then the upcoming ones, then the released ones. Each row carries the job, the recorded start and end dates, the day count those two produce, and the reason somebody typed after they made the call.
Job counts by job type, the number of jobs curing on the selected date, the number under an active hold, the recorded inspection pass rate with passed, failed, pending and overdue counts, recorded cubic yards with how many jobs recorded any, and recorded contract totals grouped by currency.
YOUR PROCESS, YOUR STARTING POINT
Useful structure. Only what you choose.
4 pipelines and 9 workflow drafts. Add the parts that match your work, with a separate sample view for exploring the interface.
01 / FOUR PIPELINES
Choose your starting structure.
Use a ready-made stage sequence or connect drafts to a suitable existing pipeline.
Residential flatwork · 8 stages
Foundations and structural · 7 stages
Masonry and hardscape · 7 stages
Commercial and municipal bids · 7 stages
02 / NINE WORKFLOW DRAFTS
Give the next step a shape.
Site visit review
Pour day confirmation review
Pour complete record
Forms inspection review
Cure check review
Final inspection review
Hold released review
Warranty walkthrough review
Weather hold record
Native trigger, task, wait, and note nodes provide editable examples. Every draft stays inactive until you review and publish it.
03 / SAMPLE WORKSPACE
Explore before adding records.
Explore nine fictional jobs across the three weeks and all six job types, from a residential driveway to a 148 yard warehouse slab, with 14 inspection records and three weather holds. Two of those holds cover today so the active hatching is visible, one inspection is recorded as failed and three as passed so all three diamond states appear, and seven of the nine rows record cure days so the lightening band reads across the board. Example edits stay in the current page’s memory and reset on navigation or reload; sample jobs are never inserted into your CRM.
No sample customers are inserted into your CRM.
Starter setup checks selected kit additions before removal and preserves edited records and live work.
THE KIT, UNPACKED
Your workspace. Your starting point. Your code to edit.
A job is a native contact-linked opportunity with a namespaced job type, site address label, crew label, cubic yards reference, mix label, a forms set flag, planned and actual pour dates, recorded cure days, a derived cure complete date, finish label, job notes, an immutable supported currency, inspection records with their result and inspector label, and weather hold records with their dates and reason. The recorded contract reference stays separate from native opportunity value. Other custom fields are preserved.
Three-week pour schedule with a solid pour block and a six step cure band that lightens one day at a time
Inspection checkpoints drawn as green, red and hollow diamonds on their own day, with no image or icon file anywhere in the kit
Weather holds drawn as hatched bands over the days they cover, red while a hold covers the selected date
One shared cure rule used by the editor, every view and the server, so a stored cure date can never disagree with its pour date
Jobs by native stage, a cross-job inspection queue with pending first, active weather holds, and insights
Archive-only inspection and weather hold records with stable IDs, so a checkpoint or a lost day is never erased
Single dark chrome bar over a white day-axis canvas with full permission-filtered CRM tools
Four optional pipeline templates and nine inactive workflow drafts
Nine fictional in-memory jobs with 14 inspection records and three weather holds across three weeks
Guided setup, compatibility report, and private rollback receipt
AI-agent documentation for customized installations
Original editable source, configuration, and tests
Run the guided setup from the extracted kit. Supported integrations can be installed directly; customized integration files get a reviewed merge.
02
Connect the required helper.
Deploy the included helper from your authoritative backend source before connected edits. Build your web app, then choose any optional pipelines and drafts you need.
03
Set up your own team.
Edit company name, descriptor, promise line, and default pipeline name. Sign in with your account and verify the workflows and permissions your team uses.
Compatibility and operational details
Seedly CRM 5.8.4 · extension API 1. Node.js 20 or newer. The installer checks supported integration-file versions and does not deploy your web app or backend. The included original pour helper is required for connected creation, editing and starter setup. It preserves native account permissions and unrelated custom fields, re-checks the cure arithmetic along with the forms, crew, inspection date and weather hold rules, and compares the current record state before saving. It exposes no stage mutation at all, so pipeline stages stay in your CRM’s own views under your existing roles. Deploy the helper from your authoritative backend source before connected edits. Pipeline presets and workflow drafts remain optional.
Every date is one somebody wrote down, and the one derived value is arithmetic on two of them. The recorded pour date is the actual pour when one is recorded and the planned pour otherwise, because the cure starts when the concrete goes down. The cure complete date must equal that date advanced by the recorded cure days and must be blank when either is missing; the editor recomputes it on every edit and the server refuses a stored value that disagrees, so the board can never contradict the sheet. Cure days are calendar days from a specification or a superintendent, never a strength calculation, maturity index or cylinder break. Because nobody pours into ground with no forms around it, a recorded actual pour requires forms recorded as set, and cure days or a crew label require a recorded pour date. A passed or failed inspection requires a recorded date while a pending one may leave it blank, and an inspection date is deliberately not constrained against the pour, because forms inspections happen before it and final inspections after it. A weather hold needs both dates in order plus a reason, and two holds on one job may overlap because rain on Monday and a freeze warning on Tuesday are separate facts. The pass rate excludes pending rows from both halves and reports None recorded rather than an invented zero. There is no weather data, forecast feed or radar, no permit system or municipal inspection scheduling, no ready-mix ordering or delivery ticket, no estimating or takeoff, no crew scheduling engine or dispatch, and no invoicing or payments. Nothing here contacts a client, an inspector or a supplier. Totals are grouped by currency and never added across currencies. The pipeline stage stays your CRM’s own: recording a pour never moves a card, and moving a card never records a pour.
Calling, messaging, signing, payments, and external integrations depend on your Seedly installation, account permissions, plan, and configured providers. Screenshots use sample data and reference imagery. Hosting, installation, and ongoing maintenance are your responsibility.
Checking access…
DEVLAUNCH ALL ACCESS
Every kit. And everything else.
DevLaunch All Access includes every GoSeedly CRM kit, all 195 available today, along with every class, course, and product we release, and private calls with Aaron.
All 195 CRM kits
Every published kit as original editable source, with optional pipelines, workflow drafts, and guided installers. Browse the kits
Every class, course, and product
The full DevLaunch library and software collection, plus each eligible release during your access year, added to your portal as it ships.
Private calls with Aaron
Bring the idea, the offer, or the bottleneck, and leave with a plan you can follow.
DevLaunch All Access
Want more than one kit? All Access covers the whole CRM kit library and the rest of what we make. See everything it includes on the All Access page.
For your own compatible Seedly CRM. Seedly software, hosting and installation services are separate. Each full-interface kit uses its own web installation.
BEFORE YOU MAKE IT YOURS
Good questions. Clear answers.
How do I receive the kit?+
Purchase securely through Whop. Your original source ZIP and installation documentation are delivered manually to the email used at checkout. This is a one-time purchase of this kit; Seedly software, hosting, and installation services are separate.
Does this include Seedly CRM?+
You obtain and configure Seedly separately. The kit adds original frontend screens, a shared theme, starter definitions, and integration instructions. It does not include Seedly’s codebase, license, hosting, or a separate CRM database.
Is this one connected workspace?+
Pour keeps its concrete and masonry navigation in one chrome bar across the original schedule views and native CRM modules. Full CRM tools remain available within the same signed-in account and application theme. Contacts, Calendar, Estimates, Documents, and other full modules retain the functionality supplied by your own Seedly installation. Existing authored content and provider screens retain their own layouts.
Can I use it with existing customizations?+
Yes, with a compatibility review. The installer checks the supported integration files. Changed integration files need a reviewed merge; the included AI-agent guide explains how to preserve custom extensions, permissions, providers, and routes.
Do I have to import all the starter content?+
No. Choose individual pipelines and workflow drafts, use a compatible existing pipeline, or install none. Workflows remain inactive until reviewed and published. They use native triggers, internal tasks, optional notes, and timed waits. A wait does not verify task completion or recheck the current stage. The included drafts do not send customer messages.
Can I remove the examples and starter content?+
Sample records stay in memory and never create customers in your CRM. Leave sample mode to return to your account. Starter setup lets you review removal of unused kit additions; server checks retain edited or published workflows and pipelines with live work or references. Removing the frontend does not delete account records.
Can different subaccounts use different kits?+
The current design and branding apply to the whole web installation. Subaccounts still separate data and access. Use a separate web installation for another full-interface kit; running different kit designs by subaccount in one installation requires additional customization.
Selected excerpts from reviews of DevLaunch training, software, and services. Individual customer experiences across DevLaunch.
Your privacy, your choice.
We use essential storage to keep the site working. With your permission, we also use analytics and the Whop Pixel to understand visits and advertising results. Optional analytics stay off until you choose.